how we can estimate the M50 concrete for foundation?
Answer Posted / satya
quantity comes in cum,i.e length x width x depth.its depend up on shape of foundation.
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
psc girder detail
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
What is the use of extruded feature in solidsworks?
how to find quantity of concrete in PCC M15
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What does civil engineering mean?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
How to calculate material and labor required for 100 m2 plaster?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
In Rcc ratio calculation I wanted to know quantity of Steel also.
What is meant by dimensioning?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
how to calculate rate analysys of 1:6 plastering 10 sq m