HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm

Answers were Sorted based on User's Feedback



HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..

Answer / ashish

Area to be covered 985 sqm
thickness = 12mm
total cubic meter of work to be done = 985*.012 = 11.82 cum
cement sand ratio = 1:4

Cement to be consumed i Volume = 11.82*1/5 = 2.364 cum
Weight of Cement used = 2.364 * 1440 (density of cement) = 3404kg

no of bags used = 3404/50 = 68 bags (approx)

Is This Answer Correct ?    4 Yes 0 No

HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..

Answer / eakub.molla

Total area=985m2
thickness of plaster=12mm=.012m
wet volume of plaster morter=985*.012=11.82m3
dry volume of morter=11.82*1.5=17.73m3
volume of cement=17.73/5=3.546m3
volume of sand=14.184m3
cement bag=3.54/.03542 bags
=100 bags.

Is This Answer Correct ?    2 Yes 0 No

HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..

Answer / k.l.b.srinivas

ACTUALLY I THINK
1 CUM = 35.315 CFT
12mm = .5"/ .039 feet /.012 M
so. 12 mm thick plastering = 1/ 0.012 = 83.33 Sqm

for 1 Cum cement required is in 1:4
1/4*1440 = 288 Kgs.
so, for 83.33 Sqm we need 288 kgs of cement & 288*4 = 1,152
Kgs. of sand multiply the amount with 985 & divide it by 83.33
3,404 Kgs. of Cement = 68 Bags.

Is This Answer Correct ?    1 Yes 0 No

HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..

Answer / mughal sab

brother in your answer plz clearly define this step
10598.6*0.5=5299.3cft
1/5*1440=288 kg\
and why cement quantity is equal to sand quantity.?

Is This Answer Correct ?    1 Yes 1 No

HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..

Answer / karthikeyan

1" = 25.4mm so,
12mm = 0.5"
total area = 985 sqm
1 sqm = 10.76 sqft
985 sqm = 10598.6 sqm
10598.6*0.5 = 5299.3 cuft(149.97 cum)
for 1 cum (1:4)1/5*1440 = 288 kg so
149.97*288 = 43191.36 kg
50 kg = 1 bag, so
863 bag cement is required
1 m^3 cement = 1 m^3 sand s0 863kg sand is
required

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

can i get civil engineering test papers.......?????

0 Answers   IBPS, IOCL,


Explain the various methods of concrete curing?

1 Answers  


which tie is used in binding of steel double tie or single ti?

1 Answers  


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

0 Answers  


how many litr. of paint will required for 1 sqm area of wall(internal wall and external wall) ?? 

4 Answers   FWO, L&T, Reliance,






How do you calculate the unit weight of concrete?

0 Answers  


Test procedure of fly ash bricks as per code ?

0 Answers   L&T,


#include<stdio.h> main() { int a=300,b,c; if(a>=400) b=300; c=200; printf("\n%d%d",b,c);

1 Answers  


What is the sugested procedure of water purification for public supply?

0 Answers  


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

0 Answers  


how much binding wire is reqd for 1 MT

8 Answers   IVRCL,


Drar the reinforcement detailing of Internal Hinge ?

1 Answers   Rites,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)