HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm

Answer Posted / ashish

Area to be covered 985 sqm
thickness = 12mm
total cubic meter of work to be done = 985*.012 = 11.82 cum
cement sand ratio = 1:4

Cement to be consumed i Volume = 11.82*1/5 = 2.364 cum
Weight of Cement used = 2.364 * 1440 (density of cement) = 3404kg

no of bags used = 3404/50 = 68 bags (approx)

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much quantity water should be placed in one cubic meter area?

898


Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)

1807


How do you measure concrete?

770


Is it possible to make a feature using an overdefined sketch?

763


Define What are the uses of alloys in daily life and how are alloys made?

736






How many days should curing of plastering, brick work and concrete

1211


Which ratio use for cement selery???

1391


1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.

7575


what is the clear cover for shearwall?

1062


WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?

1602


can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?

2070


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

1503


What is specific gravity???

882


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1813


plumbing CPVC fitting FTE Brass full form

2135