HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm

Answer Posted / karthikeyan

1" = 25.4mm so,
12mm = 0.5"
total area = 985 sqm
1 sqm = 10.76 sqft
985 sqm = 10598.6 sqm
10598.6*0.5 = 5299.3 cuft(149.97 cum)
for 1 cum (1:4)1/5*1440 = 288 kg so
149.97*288 = 43191.36 kg
50 kg = 1 bag, so
863 bag cement is required
1 m^3 cement = 1 m^3 sand s0 863kg sand is
required

Is This Answer Correct ?    0 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to create our resume?

1659


What are your future hopes for this job?

1838


Differentiate first angle & third angle projection?

658


on what basis the partial factor of safety are decided? form the load combinations

1808


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3332






Is there the dry coefficient of cement is constant?

1834


can stub column take the load as main column

1420


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

1675


How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?

1559


it is possiblee to produce concrete with out cracks...

1481


Specific gravity of cement?

1209


what could be the production cost of 1 cum of concrete by CP30 plant

1276


What is modular elasticity?

726


How to arrive d*d/162 , for finding the kg per meter , wt of steel

1406


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1158