HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm
Answer Posted / eakub.molla
Total area=985m2
thickness of plaster=12mm=.012m
wet volume of plaster morter=985*.012=11.82m3
dry volume of morter=11.82*1.5=17.73m3
volume of cement=17.73/5=3.546m3
volume of sand=14.184m3
cement bag=3.54/.03542 bags
=100 bags.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Why is the statue of liberty made of copper?
What are the joints wants to made in masonry where door opening, arches like etc..
what is kribs is supporting?
What are the different softwares used for cad?
What are the problems one might face while having a Cantilever balcony?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
How to calculate volume of concrete & steel on tank foundation & ring wall ?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
difference between fc and fc'?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Coverage of 25mm.thick ratio of 1:4 cement mortar?
how to calculate spacing rod in column
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...