Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


For 100 bag cement how i will calculate sand and metal aggregate.Mixing proportion 1:1.49:2.38



For 100 bag cement how i will calculate sand and metal aggregate.Mixing proportion 1:1.49:2.38..

Answer / poovarasan

cement : FA :CA
so , 1:1.49:2.38 means,

100 bag = 100 x 50 = 5000kg cement
cement 5000kg
FA,
1.49 x 5000 = 7450 kg sand
CA,
2.38 x 5000 = 11900kg gravel ....

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How to check the quality of fine aggregate on site?

1 Answers  


how do we design mix ratio?

0 Answers   RCC, VSS,


Rate analysis of Vitrified tile in cement mortor 1:3

0 Answers   Design Space, Muthoot Group,


how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )

0 Answers  


Minimum concrete cover in slabs, columns, beams, foundation and other st?

0 Answers  


Why reinforcement done in shorter span in two way slabs

0 Answers   Osmani Constructions,


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

0 Answers   Jain Housing,


what is CBR Test

10 Answers   HPCL,


Why are L-beams (cast monoloithic with slab)that usually occur at the slab edge, provided with overhangs?

1 Answers  


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

1 Answers  


For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?

1 Answers  


what is called Bulk Density of aggregate?

0 Answers   PBL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)