how to creat mix m-20? and how to check shuttering & how is
mark layout at open ground



how to creat mix m-20? and how to check shuttering & how is mark layout at open ground ..

Answer / ratheesh

M20 = 1:1.5:3

shuttering

1. Slab & beam bottom level should be checked.
2. All props and bracing pipes should be checked,
3. Beam & Slab side alignment should be checked
4. side shuttering plump should be checked,
5. All room dimensions & Openings dimensions should be checked
6. before reinforcement should be apply shuttering oil.

Layout

you should be use pythagoras theorem...

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What is the release of lien?

0 Answers  


How many steel is require in one cubic meter area?

3 Answers  


what is hook's law

6 Answers  


how to convert m 25 concrete to m 40?

3 Answers  


What are the Tests required to check the Quality of bar?

3 Answers  






In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

0 Answers  


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

0 Answers  


Any body please let me know how to prepare Method Statement for Bored Cast in situ piles.

4 Answers   Colliers International,


pls explain me the design procedure of multistorey building including structural analysis and also with example by considering the effect of wind load and earthquake load ?

1 Answers  


What is BOQ why to calculate BOQ

4 Answers  


How much Pressure will apply in Water proofing Grouting method to fill the crack in beams or slabs?

2 Answers   GMC,


What are the deshuttering time for Salb Beam Column RCC Wall Footing Staircase

13 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)