how to creat mix m-20? and how to check shuttering & how is
mark layout at open ground

Answer Posted / ratheesh

M20 = 1:1.5:3

shuttering

1. Slab & beam bottom level should be checked.
2. All props and bracing pipes should be checked,
3. Beam & Slab side alignment should be checked
4. side shuttering plump should be checked,
5. All room dimensions & Openings dimensions should be checked
6. before reinforcement should be apply shuttering oil.

Layout

you should be use pythagoras theorem...

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to find beam R/F cutting length

1241


What does civil engineering mean?

656


How and where are aqueducts built?

701


How to calculate unit weight of concrete for m40 grade.

3439


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1535






What is the strength of cement?

698


How do you compute the volume of airflow?

689


What is the significance of cost estimate knowledge for an architect?

1155


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2086


how much tempareture are required to make liquid state of pid leed

1717


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2394


how to calculate steel for slab or footings?

1195


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1779


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1388


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1136