Answer / sp
first we will calculate the total area of the steel
required with nos of bar of 20 mm and area of one bar of 20
mm.
and then divide with area of one bar of 16 mm.
the result will be nos of bar of 16 mm dia.
Is This Answer Correct ? | 42 Yes | 5 No |
1.5 times the no of bars of 20mm steel bars
Is This Answer Correct ? | 19 Yes | 11 No |
Answer / yogesh tripathi
P1/A1=P2/A2, where, P is spacing and A is Area of bar.
So that we will minimize the specing between bars according
this formula.
Is This Answer Correct ? | 5 Yes | 4 No |
What is green building?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
define the engineering property of a soil. make a list of list property(properties)
2 Answers AAI Airports Authority Of India,
What do we mean by partial moment release ??
Do you expect there to be many jobs for civil engineers going into the future? What are the three main drawbacks of being a civil engineer? What are the three best things about being a Civil engineer? What amount of vacation time is available to you? Is the time paid? What are the usual hours of work required? Is it possible, or common, to work from home? How much time do you spend on the site of your projects? What type of schooling is required to be a civil engineer? How many years are required to complete this education?
How to calculate chejja reinforcement
what is the meaning of degreasing of the euipment or line.
for solid cement brick without fly ash,we use dust,6mm,12 mm jelly,water my question is what Proportion we mix dust,6mm,12 mm jelly,water ? for good strength brick.
is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.
What is the difference between Wraft and file foundation and where these are used ?
HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..total area need to be plaster is 985 sqm
how can we design dia of rainwater pipes ? plez explain by using formula ?