What is the thumb rule for calculating the number of chairs in slab?
Answers were Sorted based on User's Feedback
As per IS:2502-1963 Clause 7.4.2
SL&s - In slabs, whether double or multiple, layers of
reinforcement are provided, the distances between the
layers may be maintained by the method illustrated in Fig.9
The Code does not Specify the Exact Spacing of the Chairs
but in Practal the Spacers are provided based on the
Spacing and Dia of Main Reinforcement it is 1 Chair per Sqm
Is This Answer Correct ? | 34 Yes | 9 No |
1. Chairs are provided for maintain the proper gap between the 1st layer & 2nd layer.
2. In IS Code it is not mentioned the chair spacing.
3. As per my experience it should be provided 1 chair in 1 sqm.
4. If the slab is 6 sqm then there will we use 6 nos of chairs
Is This Answer Correct ? | 9 Yes | 4 No |
Answer / moamen saad
calculate the buckling affecting the chair branches due to dead and live loads comes from top mesh load and wight of labors, check it with allowable buckling.
i did an excel sheet according to ACI-318
Is This Answer Correct ? | 1 Yes | 0 No |
what is the ingrediants of wet mix macadam?construction procedure?
what is bond strength .
How many BRICKS required for 10 cumic of brickwork
whatis the minimum strength required for M-25 grade concrete in 14days compressive test? What is the procedure of calculation?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Time required for curing of wall tiles before fixing
07. 4 main points about check list for rebar works are– ––
WHAT TYPE OF BINDING WIRE IS USED IN OFF SHORE STRUCTURES. WHEATHER COROSIVE OR NON COROSIVE LIKE EPOXY COATED,PLASTIC COATED ETC.
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
How to calculate the amount of cement & sand required for plastering work with ratio 1:4 please give me an answer with detailed step.
6 Answers DSR Management, Simplex,
How much cost is required for 1 Flyash Brick?