what is right time of slab DE shattering and beam boo tam.

Answers were Sorted based on User's Feedback



what is right time of slab DE shattering and beam boo tam...

Answer / map

It depends up on span of the beam normally after 7 days we can remove shuttering and support with props.

Is This Answer Correct ?    24 Yes 4 No

what is right time of slab DE shattering and beam boo tam...

Answer / azam

The time of slab deshutting after getting 67% strength at 4 or 7 days same for beam bottom and it also depend of span of beam.

Is This Answer Correct ?    21 Yes 3 No

what is right time of slab DE shattering and beam boo tam...

Answer / ronak shah

as per IS 456 beam bottome should be remove after 14 days.
concrete strength is more than 70%. if span is more than 11
mt then its remove after 21 days.

Is This Answer Correct ?    12 Yes 1 No

what is right time of slab DE shattering and beam boo tam...

Answer / sahilshah.civil@gmail.com

As per IS 456:2000

a) Columns/vertical member : 16-24 hrs
b) Slab - 3 day - prop to be kept below
c) Beam - 7 day - prop to be kept below

props to slab
a) spanning up to 4.5 m = 7 day
b) spanning over 4.5 m = 14 day

props to beam
a) spanning up to 6 m = 14 days
b) spanning over 6 m = 21 day

Is This Answer Correct ?    3 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / mitesh patel

Beam Sides can be allowed to be removed on the next day of
casting.
Bottoms should be allowed only after 7 days of casting.
This is practical answer on site otherwise contractors will
run away.

Is This Answer Correct ?    1 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / ananth

span length below 4.5m 7 days
span length over 4.5m 14days

Is This Answer Correct ?    1 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / md nezam

DE shattering can be done for slab bottom after 3days and Beam bottom after 7 day,but immediately props to be refixed.

Is This Answer Correct ?    3 Yes 3 No

what is right time of slab DE shattering and beam boo tam...

Answer / sagar tiwari

span length over 6m than 28 days
span length below 6m than 14 days

span length over 4.5m than 14 days
span length below 4.5m than 7 days

Is This Answer Correct ?    0 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / vinaysagar donakanty

The above answer were right but it is advisable to check strength of cubes at 3 days or 7 days or 14 days before deshuttering.

Is This Answer Correct ?    0 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / r.ranjith kumar

slab de shetting 2 day

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

Key is put at the time of casting 1st lift of column to get– –

1 Answers  


Can you tell the dia of bars and spacing for a 16'x16' room can you tell the dia of bars and spacing to be used for a slab for a 16'x16' room or any other design you explain

1 Answers  


What in your past experience or education prepares you for the position for which you are applying

0 Answers  


How to calculate the quantity of ingredients of M20 grade concrete?

0 Answers  


1 cft have 13.5 No of Bricks, can someone help me to answer me for it's mathematically proof?

2 Answers  






How to calculate the volume of sloped isolated footing?

1 Answers  


Trapezoidal section footing calculation of Volume & its Area

8 Answers   MCC, Real Value,


how the lap length is calculated in reinforcement of 110mm dia steel of Length 15.00 mtrs. & grade of concrete is M20

22 Answers   L&T,


What is the purpose of the gap in the road on this bridge?

0 Answers  


what are the basic parameters considered in designing a pavement?

5 Answers  


how to remove the quantity of metal 1 and metal 2 in concrete

0 Answers   Karthik Industries,


how can i determined the size of burfi ring?

1 Answers   Interior Designs, Simplex,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)