what is right time of slab DE shattering and beam boo tam.
Answer Posted / ronak shah
as per IS 456 beam bottome should be remove after 14 days.
concrete strength is more than 70%. if span is more than 11
mt then its remove after 21 days.
Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
How much time Required for PPR pipe network testing
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
why we are useing plastic under the lean concrete?and whts the advantage?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
What is GSB gradation
The largest size of paper used in plotter to print the drawing made by Autocad .
Why we provide hair pin for shed
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What is the meaning of a blue land surveyors flag?
what is m30 in concrete tiles
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
punj loyed and sapurjl palanjl
For Wet Mix Mecadam design what is Optimum moisture content