Answer / sunil jain civil engineer katn
CEMENT AND SAND 1:6 BRICKS WORK IN USE
CEMENT 58 KG PER/CUM ( 1CUM = 35.28 CFT)
SAND 0.243 CUM PER/CUM (1 CUM =35.28 CFT)
CEMNT 58/58= ANS.1.64 KG PER/CFT QFT BRICK WORK
SAND 0.243x35.28=8.5 PER/CUM
8.5/35.28= ANS..24 CFT PER/QFT BRICK WORK
Is This Answer Correct ? | 3 Yes | 4 No |
Answer / sunil jain civil engineer katn
CEMENT 1.64 KG
SAND .24 KG
Is This Answer Correct ? | 1 Yes | 4 No |
why main steel is to be reinforced in shorter direction in case of slab?
11 Answers CG, ESRT, Kirloskar, Lokmat, Priya,
For what building Built-on balconies are preferable? What are the advantages?
which beam has more strength rectangular or circular
how material can be calculate for brick work in 1:6
how sir calculate the slab steel and sir i want to know that how i calculate shutter works payments in cum and the rate is 120 per cum
Difference between ton and metric ton
what is the weight of 12 mm 40 mm aggregate?
Types of column foundation and how to calculate its steel quantity.
Steel Calculation for Footing, Beam & Columns?
Concrete Mix designs for M15,M20,M25,M30 and M35
23 Answers Arelgee Consultants, ATCO, Fusion, Gammon, Power Cable, Raushan Engineers, Simplex,
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Where on net can i find IS Codes?