what is right time of slab DE shattering and beam boo tam.

Answer Posted / azam

The time of slab deshutting after getting 67% strength at 4 or 7 days same for beam bottom and it also depend of span of beam.

Is This Answer Correct ?    21 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why steel rods are produced only in even dimensions?

2161


How do you calculate load bearing capacity of a waffle slab?

2206


What is the diff between cad & cadd?

645


How to design staircase.plz tell me formula for the design the staircase.

1399


material used for mendrel use to bend epoxy coated rebar

1694






What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

2260


what is the procedure of wet seiving. n percentage of silt in different type of soil?

2168


What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.

1849


Explain why concrete barriers have curved surface profiles?

819


SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?

2243


What is the difference between 53 grade and 43 grade cement

1275


A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S

1490


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

1643


Define aligned dimension?

666


what is the productivity in aluminium shuttering per day

1571