what is right time of slab DE shattering and beam boo tam.

Answer Posted / sagar tiwari

span length over 6m than 28 days
span length below 6m than 14 days

span length over 4.5m than 14 days
span length below 4.5m than 7 days

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is M40 _ TOR - EQ and B.F.S

2021


what is the difference between natural draught cooling tower and induced draught cooling tower

1826


Can we use concrete of slump cone in cube casting in which we have already measured slump?

1263


how water proof chemicals act in concrete to avoid leek?

1766


What is the diameter of the 3"inch nails?

1519






Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

1461


Please tell me vasthu room sizes. Thanks.

1762


How high should the water tank be to provide a 60 psi at base of this water tower?

674


How to calculate paint drums per meter square

2016


Define relative co-ordinates?

692


Define What are the materials used in building a gravity dam?

735


how to calculate the chair reinforcement length in slabs, footing or anywhere??

1882


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

1707


How many are the types of joints?

688


What out turn civil works

6348