1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answers were Sorted based on User's Feedback
Answer / shahul hameed
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0
= 10-1+ 1 + 1 + 1 + 1 + 1+0
=9+5 =14
| Is This Answer Correct ? | 14 Yes | 0 No |
Answer / er shalu verma
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0
=(1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1) - 1 + (1 + 1 + 1 +
1 + 1) + (1 x 0)
=10-1+5+0
=15-1
=14
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / dharmendra ray
1+1+1+1+1+1+1+1+1+1-1+1+1+1+1+1+1x0
=1+1+1+1+1+1+1+1+1+1-1+1+1+1+1+1+0
=15-1+0
14
| Is This Answer Correct ? | 3 Yes | 0 No |
is load combination is necessary in staad pro design
what is polity
what is the defination of an ideal fluid?
what is BOQ? BOQ IS US IN ESTIMATE
Define what is quality...
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
How much percent dry volume consider for concrete
what is column foundation
How to take cutting length of Stirrups when 10 leg has given Size is 1200x1200
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
cross hairs in surveying telescope are fitted in the objective lense at the center of the telescope at the optical centre of eyepiece in front of the eyepiece
For Wet Mix Mecadam design what is Optimum moisture content
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)