1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??

Answer Posted / shahul hameed

1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0

= 10-1+ 1 + 1 + 1 + 1 + 1+0
=9+5 =14

Is This Answer Correct ?    14 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to take labor charges for construction of 1cum of concrete?

681


water leak detection system question & answer

1940


What do you mean by honeycomb in concrete?

706


what is that one cub metre plaster in cemant and fine sand

1516


how to shuttering is used in slab

1317






What is aggregate?

725


What is difference between combin footing & rapt footing

1127


What are the benefits of rcc pipes over steel designed pipes?

785


1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall

1930


Rate analysis of Vitrified tile in cement mortor 1:3

3935


what is the calculation of raw material for 0.35cum of m-15

1037


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

2772


What is quantity of cement and sand required for 2000sqft of tiling?

2391


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2600


what does the grad of cement shows (denotes)?

1145