i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
The largest size of paper used in plotter to print the drawing made by Autocad .
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
water leak detection system question & answer
calculate the quantity of water for 1:6 cement mortar
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
How many cement sand ballast in cc 1:4:8 40mm
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
How do you prepare Material Recovery Statement for deduction from contractors bills?