How much percent dry volume consider for concrete
Answers were Sorted based on User's Feedback
Answer / bharath m/8438238335
For 1m3 wet volume concrete,1.57 m3 or 157% dry volume required if mix using 20 mm metal.
and 1.52 m3 or 152% dry volume required if mix using 40 mm metal.
This is based on Experimental Investigations arrived.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / shivakumara
Depending on the gradation of aggregate it varis from 40to
70 percent
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / hassan bin mohsin
Dry volume consider of concrete
1.54 to 1.57 time dry volume of concrete
They for it considers 45% to 50% it increases in volume
Is This Answer Correct ? | 0 Yes | 0 No |
whatis the minimum strength required for M-25 grade concrete in 14days compressive test? What is the procedure of calculation?
Pls. help. If a contract was awarded to a contractor in april 2012 with steel & cement base price as rs. 45/kg & 250/bag. Now in oct. 12 steel cement price becomes 55/kg & 290/ bag. How escalation will be calculated? Pls. tell complete calculation Regards,
1 bundle=how many rods s there? and what is the length of each rod
qty of cement,sand and aggregate (1:3:6) required for RCC Slab size 1000 x 500 x 100 mm
what is education Cess.
I'm diploma civil engineer. My question is what better after diploma 1- BE/B.TECH 2.EXPERIENCE Pls.suggest.
What is the difference between routing maintenance and major maintenance in school facilities?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
How do you calculate the unit weight of concrete?
What are the Types of foundation?
what is relation between SPT N value and driving piles after conducting a soil test?
How to activate isometric axes in cad?