what is BOQ? BOQ IS US IN ESTIMATE
Answers were Sorted based on User's Feedback
Answer / nag
Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / dinesh.rk
YES BOQ IS BILL OF QUANTITIES. BUT IT IS PREPERED BEFORE
THE EXECUTION - FOR TENDER PURPOSE OF THE PARTICULAR
PROJECT/
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / saumik mallick
BOQ stands for Bill of Quantity.
In BOQ the gross qty. of every item related to the execution
of work has given.
On the basis of that we can easily know that what is the
actual scope of work.
If any, executed qty. is more than the BOQ qty. they we can
submit the Deviation Statement. (Not applicable for Lump-Sum
Contract)
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / vincent koil raj
bill of quantities (BOQ) An itemized list of materials, parts, and labor (with their costs) required to construct, maintain, or repair a specific structure
| Is This Answer Correct ? | 2 Yes | 0 No |
What is the ratio of cement,sand,aggregate of mix m25
what is main diffrence between vitrified and cremic tile????
2 Answers Colliers International,
what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
Why provide strripus in a column minimum and maximum spacing.
What should be the Slump(Min.)in cement in concrete in all grades of concrete?
How to Calculate the spacing of bars if we use 12 mm dia. bars instead of 10 mm dia. bars. Whereas the 10 mm dia. bars spacing given 0.250 as pr drawing. ?
Test procedure of fly ash bricks as per code ?
wheather Micro silica/silica fumes is an ad-mixture or accelerator.
What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
what is difference in chemical composition between fe415 and fe500
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)