How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
Answers were Sorted based on User's Feedback
Answer / santosh singh
the procedure to calculate quanity is given below
eg. if cement mortar ratio is ( 1:6)
suppose 1 cum of cement mortar work is to be done
then add 60% extra for voids & cavities in case of plaster
then total volume of work = 1 + 60/100 x1 =1.6 cum
quantity of cement in cum = 1.6 / (1+6)= 1.6/7=0.228 cum
but as we know cement is available in market in 50 kg
bags (volume of 50kg cement is = 0.0347 cum)
thu quantity of cement in bags = 0.228/0.0347= 6.57 bags
quantity of sand in cum= 0.228 x 6 =1.36 cum
eg. if cement mortar ratio is ( 1:4)
suppose 1 cum of cement mortar work is to be done
then add 60% extra for voids & cavities in case of plaster
then total volume of work = 1 + 60/100 x1 =1.6 cum
quantity of cement in cum = 1.6 / (1+4)= 1.6/5=0.32 cum
but as we know cement is available in market in 50 kg
bags (volume of 50kg cement is = 0.0347 cum)
thu quantity of cement in bags = 0.32/0.0347= 9.22 bags
quantity of sand in cum= 0.32 x 4 =1.28 cum
this is exact procedure.you can calculate for any ratio of
cement & mortar
Is This Answer Correct ? | 303 Yes | 69 No |
Answer / guppi chandra sekhar
Calculation of materials for 1cum of 1:6 Cement Mortar by
Volumetric method:
Specific Gravity of Cement = 3.15 ; Density of Cement =
1440kg/cum
Specific Gravity of Sand = 2.6 ; Density of Cement =
1550kg/cum @ 5% moisture
First of all we have to calculate yield of 1 cement bag
(50kg) mixed in 1:6
Volume of Cement = (50/1440) = 0.03472cum
Volume of Sand mixed = 6 X 0.03472 = 0.208cum (contains 5%
moisture)
Volume of only sand = 95% of 0.208 = 0.198 cum
Absolute volume of Cement = 50kg / (3.15X1000) = 0.016 cum
Absolute volume of sand = Weight of sand / (2.6 X 1000) =
(0.198 X 1550) / (2.6 X 1000) = 0.118 cum
Let volume of water added = 30litres = 0.03 cum
Moisture present in the sand = (0.208 - 0.198) = 0.01 cum
Total volume of water = 0.03 + 0.01 = 0.04 cum
Let, Moisture content in the mortar = 2% of yield
Let, yield = Y
(1-2%)Y = Absolute volumes of (Cement + Sand + Water) =
0.016 + 0.118 + 0.04 = 0.174 cum
Total Yield Y = 0.174 / 0.98 = 0.178 cum
1bag of 50kg Cement produces = 0.178 cum of 1:6 Cement
Mortar with 0.208cum of Sand @ 5% Moisture and 30 litres of
water.
Therefore, 1 cum of 1:6 Cement Mortar requires :
Cement = 1bag X 1/ 0.178 = 5.62 bags
Sand = 0.208 X 1 / 0.178 = 1.17 cum
Water = 30 X 1 / 0.178 = 168 .5 litres
Is This Answer Correct ? | 54 Yes | 21 No |
Answer / saritha
how to calculate cement and sand quantities in cement
mortar as 1:3?
Is This Answer Correct ? | 20 Yes | 8 No |
Answer / sagar
how to calculate water for brick work , plaster , flooring,
emergency.
Is This Answer Correct ? | 16 Yes | 8 No |
Answer / osbert (civ eng. student maker
take an example 1:4, total ratio(1+4)is 5. assume total
volume of mortar required is 10cubic metre. this will
contain 1/5of10=2cubic metre of cement and 4/5of10=8cubic
metres of sand. density of cement as 1440kg/m3, mass of
cement will be 2x1440=2880kg and number of bags
2880/50=57.6bags. note
(i) 50kg is mass of 1 bag of cement.
(ii)other irregularities like covering voids, reduction in
volume/shrinkage due to setting of cement etc should be
considered by factoring the total volume by say 1.4.
(iii)for water use about 30% of the raw volume of sand and
cement.
Is This Answer Correct ? | 17 Yes | 14 No |
Answer / v.kapil
I think Mr. kamlesh is right
The considraion of voides for mortor is 25% and rest method
is same as our conventionel menthod, but for plaster 30 %
should be increase for undulation ( uneven wall surface)
also so total dry volumn is 1 + 25% + 30% = 1.55 Cum
Is This Answer Correct ? | 16 Yes | 15 No |
Answer / prakash
Calculation Method
Plastering with CM 1:5 12 mm thick - 10 m2
Area to be Plastered = 10 m2
Thickness of mortar Layer = 12 mm = 0.012 m
Volume of mortar required = 10 x 0.012 = 0.12 m3
Add 15 percent allowance for undualation of surface & wastage = 0.018 m3
so, total volume of Mortar Required = 0.138 m3 say 0.14 m3
sand required for 0.14 m3 of CM 1:5 = 0.14 m3
cement required for 0.14 m3 of CM 1:5 = 0.14/5 = 0.028 m3
wt of cement required = 0.028 x 1440 = 41 kg
Is This Answer Correct ? | 24 Yes | 24 No |
Answer / guppi chandra sekhar, au colle
Calculation of materials for 1cum of 1:6 Cement Mortar by
Weighing method:
Specific Gravity of Cement = 3.15 ; Density of Cement =
1440kg/cum
Specific Gravity of Sand = 2.6 ; Density of Cement =
1550kg/cum @ 5% moisture
First of all we have to calculate yield of 1 cement bag
(50kg) mixed in 1:6
Weight of Cement = 50kg
Weight of sand mixed = 6 X 50 = 300kg (contains 5%
moisture also)
Approximate volume of sand = 300 / (2.6 X 1000) = 0.12 cum
(contains 5% moisture also)
Weight of only sand = 95% of 300kg = 285 kg
Absolute volume of Cement = 50kg / (3.15X1000) = 0.016 cum
Absolute volume of sand = Weight of sand / (2.6 X 1000) =
285 / (2.6 X 1000) = 0.11 cum
Let volume of water added = 25 itres = 0.025 cum
Moisture present in the sand = 300 - 285 = 15kg = 15
litres = 0.015 cum
Total volume of water = 0.025 + 0.015 = 0.04 cum
Let, Air content in the mortar = 2% of yield
Let, yield = Y
(1-2%)Y = Absolute volumes of (Cement + Sand + Water) =
0.016 + 0.11 + 0.04 = 0.166 cum
Total Yield Y = 0.166 / 0.98 = 0.17 cum
1bag of 50kg Cement produces = 0.17 cum of 1:6 Cement
Mortar with 0.12 cum (equals to 300kg) of Sand @ 5%
Moisture and 25 litres of water.
Therefore, 1 cum of 1:6 Cement Mortar requires :
Cement = 1bag X 1/ 0.17 = 5.88 bags
Sand = 300 X 1 / 0.17 = 1765kg (or) equivalent to 0.71 cum
by volume
Water = 25 X 1 / 0.17 = 147 litres
Is This Answer Correct ? | 9 Yes | 10 No |
For planter 20mm thickness
area 100m2
= 100*.02= 2m3
20% for wide of brick work & westage.
=2*.2= 2.4m3
Bluk 1.3
=2.4*1.3=2.99m3
Ratio
1:2
=1/3*2.99=.996m3(cement)
For bag .996/.03496=28.45bagscement
for slarry 1sqmtr =2kg cement.
So 100sqmtr 200kg/50 =4 bags
total cement qty =28.45+4= 32.45 bags cement
Sand
=2.99*2=5.98m3 sand
Note: this qty condider for only for plaster.
Is This Answer Correct ? | 10 Yes | 14 No |
what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)
In your experience what is the maximum beam length. What's beam size and also please provide column size also. Thanks.
what is the no. of IS Code?
hello; sir. i would like to be an assistant executive engineer in irrigation department. is it really necessary to take coaching? or can i prepare myself by studying any study materials available in market? if so; what are the books i have to purchase. please reply soon.
how to laying tarfelt on asbestos roof for leeks water?
Meaning of m20 and m200 concrete
10 Answers WBPSC West Bengal Public Service Commission,
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
why we are using stub column..? is it possible to construct steel stub column..?
what is Brest Wall?
How many bricks in one cubic meter? Birck size 22.9*11.4*7.6 joint 12mm Give me answer with calculations
How many cement bags of 50Kgs will be required for 2600sqft terrace with thickness of 5".
what would be compressive strength of cube for 7 days if design mix of M15