How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
Answer Posted / santosh singh
the procedure to calculate quanity is given below
eg. if cement mortar ratio is ( 1:6)
suppose 1 cum of cement mortar work is to be done
then add 60% extra for voids & cavities in case of plaster
then total volume of work = 1 + 60/100 x1 =1.6 cum
quantity of cement in cum = 1.6 / (1+6)= 1.6/7=0.228 cum
but as we know cement is available in market in 50 kg
bags (volume of 50kg cement is = 0.0347 cum)
thu quantity of cement in bags = 0.228/0.0347= 6.57 bags
quantity of sand in cum= 0.228 x 6 =1.36 cum
eg. if cement mortar ratio is ( 1:4)
suppose 1 cum of cement mortar work is to be done
then add 60% extra for voids & cavities in case of plaster
then total volume of work = 1 + 60/100 x1 =1.6 cum
quantity of cement in cum = 1.6 / (1+4)= 1.6/5=0.32 cum
but as we know cement is available in market in 50 kg
bags (volume of 50kg cement is = 0.0347 cum)
thu quantity of cement in bags = 0.32/0.0347= 9.22 bags
quantity of sand in cum= 0.32 x 4 =1.28 cum
this is exact procedure.you can calculate for any ratio of
cement & mortar
| Is This Answer Correct ? | 303 Yes | 69 No |
Post New Answer View All Answers
Dear Sir What is the Contraction joint for base Slab
Concrete cover for slab, column, beam and footing?
Can we use concrete of slump cone in cube casting in which we have already measured slump?
Scaffolding IS code NO.
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
explain what do you mean by the property development.
What is the name of this multiplication factors ?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
what is tension column?
what are the code used for residental building?
What is the crank length in the slab?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
How to find permissible diagonal tensile stress in reinforced brick work
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)