you are working as a QC in hihg rise building. when what"s ur responsibilities works?..

Answer / ramanathan

1.Ist I have to know about the PQAP
2.To meet the client requirements
2.What is my role there (i.e Structural & Finishing
item),then I have to do as per ITP.

Is This Answer Correct ?    2 Yes 0 No

you are working as a QC in hihg rise building. when what"s ur responsibilities works?..

Answer / bala

1.I v'll get PQP and related document from my department to
know about my role and responsibility if iam fresh to QC
department.

Is This Answer Correct ?    3 Yes 2 No

you are working as a QC in hihg rise building. when what"s ur responsibilities works?..

Answer / jeyakumar

Refer Projects quality plan and do the job.If any
deviations found inform site engg/incharge and do rectify
and redo the same as per PQP.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

which tests for concrete pouring period at the site?

5 Answers   Al Turki, L&T,


what is workability,define it?

1 Answers  


Find out the Cutting Length of Closed Hoop 2 Legged Stirrups for Beam as mentioned. Beam Size :200x300 mm,Nominal cover for all sides :25 mm,8 mm dia. Fe415/500/550.

1 Answers   Intel,


what is idealized curve for concrere and steel

0 Answers   CSIL,


which grade of cement mostly used in construction and why..??

6 Answers   L&T,






How much shuttering oil required for per m2 shuttering by 12mm ply

3 Answers  


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

0 Answers   DBM,


How to calculate chejja reinforcement

0 Answers   Grow Homes,


What is the order of MIX Design of concrete? a)Cement :Stone:Sand b)Cement :Fine aggregate :Coarse Aggregate?

2 Answers  


about 200 cubic mtr

0 Answers  


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

0 Answers  


How to find out kg per Sft ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)