you are working as a QC in hihg rise building. when what"s
ur responsibilities works?
Answers were Sorted based on User's Feedback
Answer / ramanathan
1.Ist I have to know about the PQAP
2.To meet the client requirements
2.What is my role there (i.e Structural & Finishing
item),then I have to do as per ITP.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / bala
1.I v'll get PQP and related document from my department to
know about my role and responsibility if iam fresh to QC
department.
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / jeyakumar
Refer Projects quality plan and do the job.If any
deviations found inform site engg/incharge and do rectify
and redo the same as per PQP.
Is This Answer Correct ? | 1 Yes | 0 No |
which tests for concrete pouring period at the site?
what is workability,define it?
Find out the Cutting Length of Closed Hoop 2 Legged Stirrups for Beam as mentioned. Beam Size :200x300 mm,Nominal cover for all sides :25 mm,8 mm dia. Fe415/500/550.
what is idealized curve for concrere and steel
which grade of cement mostly used in construction and why..??
How much shuttering oil required for per m2 shuttering by 12mm ply
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
How to calculate chejja reinforcement
What is the order of MIX Design of concrete? a)Cement :Stone:Sand b)Cement :Fine aggregate :Coarse Aggregate?
about 200 cubic mtr
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
How to find out kg per Sft ?