How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
Answers were Sorted based on User's Feedback
Answer / will
Say cement sand ratio is 1:6
calculate the quantity of mortar in 1m2 of brickwork, say
it is 0.01912.
just devide by the ratio considering 60% for wastage, say
0.01912/1*0.6=0.01147 volume of cement in the mortar.
Divide the total volume of cement by 0.0345 which s the
volume of 1 bag, say 0.01147/0.0345=0.33257/m2*number of
m2, say 100m2=34bags.
Is This Answer Correct ? | 5 Yes | 9 No |
Answer / dilshad akthar
ratio: 1:4
for 1 m3,cement= 1/(1+4)=1/5=.2m3,let it be .2+.6*.2=.32
quqntity of cement:
.32*1440(unit wt of cement)*1=460.8
bags rqd= 460.8/50(1 bag)=9.2````let be 10;
sand requred
4*.2*1=.8m3
typical one load==5m3
Is This Answer Correct ? | 0 Yes | 4 No |
Answer / t.chandrasekar
the unit weight of cement is 1440kg/m3.
for 1 m3 of 1:1 cement mortor the reuirement of sand is 1m3
and cement will be 1part of sand that is 1 m3 thus weight
of cement required is 1x1440kg/m3=1440 kg.
for 1 m3 of 1:2 cement mortor the reuirement of sand is 1m3
and cement will be 1/2 part of sand that is 0.5 m3 thus
weight of cement required is 0.5x1440kg/m3=720 kg.
for 1 m3 of 1:4 cement mortor the reuirement of sand is 1m3
and cement will be 1/4 part of sand that is 0.25 m3 thus
weight of cement required is 0.25x1440kg/m3=360 kg.
for 1 m3 of 1:6 cement mortor the reuirement of sand is 1m3
and cement will be 1/6 of part sand that is 0.5 m3 thus
weight of cement required is 1/6x1440kg/m3=240 kg.
Is This Answer Correct ? | 44 Yes | 49 No |
Answer / kamlesh patidar
in cement morter the void between sand and cement is less
and take 25% total wet volume of water.take 10 cu m wet
volume of morter increse 25% than total volume of dry
material 12.5 cu m . if we find the material in 1:6 morter
than 12.5/(1+6)
cement=1.78 cu m sand=1.78*6=10.71cu m
Is This Answer Correct ? | 11 Yes | 17 No |
Answer / syed mahaboob hussain
the procedure to calculate quanity is given below
RATIO (1:6)
NOTE = 1:6: 0.55(Water) = + (7.55)
CEMENT = 1m3/7.55 x 1 = 0.132m3 (No of Kg = 0.132 x 1506 =
198.792kg)
Sand = 1m3/7.55 x 6 = 0.794m3 (No of Kg = 0.132 x 1650 =
437.250 kg)
Water = 1m3/7.55 x 0.55 = 0.072 m3 ( No of Kg = 0.072 x
1000 = 72liter)
Is This Answer Correct ? | 20 Yes | 52 No |
What is a projection line?
How to calculate cement required for m20,m5 grade
Dear Sir , I have my diploma in civil engineering in distance mode, so can i do my B.teck in regular stream . kindly suggest Regards Ramakrishna
what is the meaning or full form of 12T13 cables used in prestressed bridges
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
how to calculate the weight of bending wire for 1sqmts .how much bending use for 1ton steel
what is bolt value?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
How much steel required in 1 square feet slab?
What is the standard size of a brick used in North India?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
0 Answers Pandey Construction Company,