How du we calculate dry cement (in Bags) for any concrete,
also sand and aggregate? How many bags of cement does 100
cft of concrete 1:2:4 require? Procedure to calculate the
required amount. Also if there is any easy thumb rule to
find out.

Answers were Sorted based on User's Feedback



How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags ..

Answer / muhammad younas

100*1.54=154 (1.54 for wet to dry)
1+2+4=7 (sum of ratio)
formula:
cement : (154*1)/7=22 cft = 22/1.25=17.60 Bags
sand : (154*2)/7=44 cft
aggregate: (154*4)/7=88 cft

Is This Answer Correct ?    18 Yes 2 No

How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags ..

Answer / dushyant bansal

Esasiest way to calculate the cement content is thumbrule

as if in 1:2:4 concrete there are 8 bags of cement per cum.
of concrete i.e. 35.325 cft concrete 8 bags cemnt

In schedule of rates amount of cement, sand and aggregates
according to their ratios is given.

Is This Answer Correct ?    10 Yes 3 No

How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags ..

Answer / mayank jain

14.28 cft

Is This Answer Correct ?    6 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

6mm dia rod legth 1feet

5 Answers  


What do you mean by the word 'shear'?

0 Answers  


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

0 Answers   NCC,


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

0 Answers  


Why I-section is preferred to channel section?

7 Answers   Engineers India,






what is difference between curtain walling and glazing and spider system which are using in building external finish systems.

2 Answers  


how to calculate the steel for 450 sft slab, please tell me the solution method

1 Answers  


Can we use PPC cement for RCC works? Upto which grade it can be used?

3 Answers  


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

0 Answers  


What is the acceptable percentage of slump in Mix concrete?

9 Answers  


WHEN A RIVER STARTS MENDERING WHAT CONDITION WILL OCCUR?

3 Answers  


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

0 Answers   Clarus,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)