How du we calculate dry cement (in Bags) for any concrete,
also sand and aggregate? How many bags of cement does 100
cft of concrete 1:2:4 require? Procedure to calculate the
required amount. Also if there is any easy thumb rule to
find out.

Answer Posted / mayank jain

14.28 cft

Is This Answer Correct ?    6 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

 Which Types Of Bricks ? 

2525


How to estabilish reinforcement Steel rolling margin for a building projects ?

3651


What are the common ways of demolition?

724


reinforcement slab, beam and column formulas?

2200


How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.

2190






i want texture painting pwd data

1650


What is meaning of FREE STANDING STAIRCASE ?

2502


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1285


At what point does a circle start losing area when being flattened?

636


Define What is a kip?

730


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1546


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

1808


TELL ME THE EQUATION FOR OGEE SPILLWAY

2175


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1676


what is the breaking strength of wall tiles

1948