what is mean by eccentric footing?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
Yes where space are not avilable ecetric footing are done.
the load of the columnis lies on the side on the 1/4th of
the footing
Is This Answer Correct ? | 19 Yes | 3 No |
Answer / suresh
if vertical member load is located not exact in centre of
the footing is called eccentric footing.examble combined
footing
Is This Answer Correct ? | 12 Yes | 4 No |
Answer / murugan
Yes where space are not avilable ecetric footing are done.
the load of the columnis lies on the side on the 1/4th of
the footing
Is This Answer Correct ? | 7 Yes | 0 No |
what is the FE415 & FE500?WHAT IS ITS STRENGTH?
what is the purpose of laying PCC?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
How calculate the material in concrete mix in ratio 1:2:4 ?
Do you expect there to be many jobs for civil engineers going into the future? What are the three main drawbacks of being a civil engineer? What are the three best things about being a Civil engineer? What amount of vacation time is available to you? Is the time paid? What are the usual hours of work required? Is it possible, or common, to work from home? How much time do you spend on the site of your projects? What type of schooling is required to be a civil engineer? How many years are required to complete this education?
Define different types of roof systems?
How many Steel used in 1 cum tower foundation
how can economic during construction of a project.
Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
how to calculate width and thickness of columns and beams for differnt area with example
which type of instrument included in plumbing work?name of instrument?
Explain what is progress payment?