how many labour is required for 1cum of concrete?
Answers were Sorted based on User's Feedback
Answer / enayatullah mahroowal
0.36 skilled and 2 unskilled labour is enough form onc cum
concrete
Is This Answer Correct ? | 22 Yes | 7 No |
Answer / sathesh.b.nama
3CUM/DAY/ MASON WITH 1 HELPER CAN DO RCC & 5CUM/DAY/MASON WITH 1 HELPER CAN DO PCC..IS NORMAL PRODUCTIVE NORMS OFA A MASON NOW-A-DAYS
Is This Answer Correct ? | 12 Yes | 6 No |
Answer / mkg
a gang of 18 labour is required at a mixer machine for rcc work.
Is This Answer Correct ? | 7 Yes | 11 No |
Answer / chandu
Around 2 Mason and 1.5 helper per 1 cum concrete
Is This Answer Correct ? | 2 Yes | 21 No |
how calculate the ms angle weight formula detail
9 Answers Concor, Puravankara,
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
15mm thick plastering 1:4 what is the cement consumption per sqm
advantages & disadvantages of using crusher dust instead of sand in r.c.c work
3 Answers L&T, Shm Consultants,
Any body tell me how can we calculate 1m3 quantity of cement sand aggregrate in kg.
what is correct temperature for pouring concrete?
why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?
what is the proportion of m20 grde concrete? also how much water is required for this proportions? As there were any formula for water-quantity?
how the slump and Compressive Strength of concrete cube is performed in a civil engg lab ?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
what is difference between open and well foundation ?
What are the different softwares used for cad?