how many labour is required for 1cum of concrete?

Answers were Sorted based on User's Feedback



how many labour is required for 1cum of concrete? ..

Answer / enayatullah mahroowal

0.36 skilled and 2 unskilled labour is enough form onc cum
concrete

Is This Answer Correct ?    22 Yes 7 No

how many labour is required for 1cum of concrete? ..

Answer / sathesh.b.nama

3CUM/DAY/ MASON WITH 1 HELPER CAN DO RCC & 5CUM/DAY/MASON WITH 1 HELPER CAN DO PCC..IS NORMAL PRODUCTIVE NORMS OFA A MASON NOW-A-DAYS

Is This Answer Correct ?    12 Yes 6 No

how many labour is required for 1cum of concrete? ..

Answer / babu

Depend by work
area..

Is This Answer Correct ?    5 Yes 3 No

how many labour is required for 1cum of concrete? ..

Answer / mkg

a gang of 18 labour is required at a mixer machine for rcc work.

Is This Answer Correct ?    7 Yes 11 No

how many labour is required for 1cum of concrete? ..

Answer / ahmed

1 Mason with 1 helper can do 30MT3 per day

Is This Answer Correct ?    8 Yes 26 No

how many labour is required for 1cum of concrete? ..

Answer / chandu

Around 2 Mason and 1.5 helper per 1 cum concrete

Is This Answer Correct ?    2 Yes 21 No

Post New Answer

More Civil Engineering Interview Questions

how calculate the ms angle weight formula detail

9 Answers   Concor, Puravankara,


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

0 Answers   UltraTech,


15mm thick plastering 1:4 what is the cement consumption per sqm

6 Answers   Well Care,


advantages & disadvantages of using crusher dust instead of sand in r.c.c work

3 Answers   L&T, Shm Consultants,


Any body tell me how can we calculate 1m3 quantity of cement sand aggregrate in kg.

4 Answers  






what is correct temperature for pouring concrete?

3 Answers   L&T,


why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?

1 Answers  


what is the proportion of m20 grde concrete? also how much water is required for this proportions? As there were any formula for water-quantity?

3 Answers  


how the slump and Compressive Strength of concrete cube is performed in a civil engg lab ?

8 Answers   Lodha, SSC,


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

0 Answers  


what is difference between open and well foundation ?

2 Answers  


What are the different softwares used for cad?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)