What are the advantages of Prestressed Concrete

Answers were Sorted based on User's Feedback



What are the advantages of Prestressed Concrete..

Answer / sjtbehera ( hari machines)

advantages-
1. reduction of steel corrision
2.increase durability
3.higher moment of inertia
4. high capacity bearing strength
5. high span-to-depth ratio
sutable for precast concrete

Is This Answer Correct ?    13 Yes 1 No

What are the advantages of Prestressed Concrete..

Answer / h. k .prusty

By prestressed cocrete you can save the quantity of steel.

Is This Answer Correct ?    6 Yes 4 No

What are the advantages of Prestressed Concrete..

Answer / prashanth

1.Time consuming will be less.
2.Required strength will be obtaining.
3.Wastage of the materials will be reduced.
4.Project work will not get delay.
5.required shape of the structure will be obtain.
6.Quality of the structure can be maintain.

Is This Answer Correct ?    1 Yes 3 No

What are the advantages of Prestressed Concrete..

Answer / abdul hamid

Prestress Concrete advantages:
1)Reduced section of member (saved concrete quantity)
2)Induced negative bending moment before putting in to
loading condition, so concrete tention failure avoided.
3)less quantity of reinforcement.
4)Due to compressed concrete, higher load bearing capacity
of member.

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

Water absorption for stone?

6 Answers  


Coarse aggregate & fine aggregates are called inert material when used in RCC work because------

5 Answers  


How many types bend used in civil reinforcing

0 Answers   HARIOM TMT,


What is the lap lenth for welded joints for reinforcement bars. and what is its IS code no.

5 Answers  


In interview,if they ask what are your achievements in your career?how to answer this question?

2 Answers   GMR, Taehwa Enterprises,






in staad ,why we realease a moment of a member ? what is affect if we realease a moment

0 Answers   Idea,


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

0 Answers   NA,


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

0 Answers  


How many % we consider for lap for reinforcement for estimates

0 Answers   Upleel,


can you provide a link for manual design of building?

0 Answers  


Wat are the elements consider in the shuttering load design calculation

1 Answers  


what is cement wastage percentage in NHAI ROAD WORKS

0 Answers   Transstroy,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)