Answer Posted / abdul hamid
Prestress Concrete advantages:
1)Reduced section of member (saved concrete quantity)
2)Induced negative bending moment before putting in to
loading condition, so concrete tention failure avoided.
3)less quantity of reinforcement.
4)Due to compressed concrete, higher load bearing capacity
of member.
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
Sir how to find cutting length for footing steel bars in the shape of "u"
Difference between pre-tensioning and post-tensioning.
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
what is civil all interview questions
What is Joule Brayton Cycle?
what are RIB slabs explain about it
Does VDF add strength to the flooring apart from preventing water ingress?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
What is specific gravity???
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
How much is the cover for slab?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?