Answer Posted / prashanth
1.Time consuming will be less.
2.Required strength will be obtaining.
3.Wastage of the materials will be reduced.
4.Project work will not get delay.
5.required shape of the structure will be obtain.
6.Quality of the structure can be maintain.
Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is the difference between linear dimension and aligned dimension?
how much of the strength comes from post-production curing
all technical question
Why should pumping be not used in case of concreting works?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
Civil engineering material testing Standard results
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
How can you distinguish between sorption, absorption and adsorption?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
What is construction mitigation management?
what is constat for brickwork
What is alternate bid?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm