Answer / purushotham
It can be calculated therotically and phiscically.
Theoritically:
1.Terzagi theory.
2.Mayer hoff theory.
3.Wave electron theory.
Phsically:
Load plate test.
bore test.
electro magnetic test
Is This Answer Correct ? | 31 Yes | 3 No |
Answer / j r
1.standard penetration test ( feild )
2.drilling of bore hole in all kinds of soil.
3.collection of distrubed soil from various depth.
4.conducting laboratory test.
5.finding the N value of the distrubed soil.
Bearing capacity calculation : C Nc dc Sc ic
Is This Answer Correct ? | 19 Yes | 6 No |
Answer / mayank jain
depend on a type of project ()
3D settlement analysis (performed at burj dubai)
bore hole up to 90m
use software PIGLATE
or
Plate load test
or
SPT number
or
consolidation test
direct shear test
void ratio and w/c
terzaghi bearing capacity
............
much more
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / rushikesh mulik
1 Tarzagi analysis method
2 Standerd penitration test
3 Plate load test
4 Mat floting test
5 it depend on the type of soil like coarse grained soil & fine graned soil
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / aqueel khan
W1+w2+w3 devided by safe bearing capacity of soil
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / arun kumar
insert bar in to the soil by
mean of rammer apply pull
out test on it this procedure
apply to diff location at site
and collect the average
value of it this is your
bearing capacity of soil
Is This Answer Correct ? | 1 Yes | 2 No |
Is there the dry coefficient of cement is constant?
how to identify different types of soils in field?
How to increse bearing capacity in soils (Stabilisation of soils)
what is the design procedure for building
how many kilograme per metre run of 6mm diameter steel bar
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
how to calculate estimation for puttey... give me an example
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
As a proof of my analytical skills I was asked to give an example of a real life situation that i have solved analytically ? Can anybody give me a clue what kind of examples should be a suitable answer ?
how to do sudoko puzaals?
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')