Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


We have a 12MW power plant & we inject 5-6MW power to
Orissa GRID. For this we have a 33KV/11KV switch yard
having 12.5MVA power transformer. Some times we draw power
during emergency. It is observed that during Export or
Import for load less than 500Kw the power factor is
decreasing to 0.3 . This is happening only during export or
import. During island condition TG power factor OK.Our
capacitor bank is provided with our Power plant auxilliary
load. Please suggest how I can we improve our power factor
during low load (GRID).

Answers were Sorted based on User's Feedback



We have a 12MW power plant & we inject 5-6MW power to Orissa GRID. For this we have a 33KV/11K..

Answer / velusamy

This problem can be solved by switching off all capacitor
banks during low load. we have faced Similar type of
problem in our cement plant loads which are fluctuating in
nature which causes export / import of power fluctuation(
loads go +500kw and - 500kw withing 1 or two seconds).

The main reason for this low power factor is due to
reactive power consumption of your 12.5 MVA power
transformer.

Is This Answer Correct ?    2 Yes 2 No

We have a 12MW power plant & we inject 5-6MW power to Orissa GRID. For this we have a 33KV/11K..

Answer / s.balasubramanian

If you can furnish me the scheme used by you for import
export ontrol I will be able to review
balasubramanian

Is This Answer Correct ?    0 Yes 0 No

We have a 12MW power plant & we inject 5-6MW power to Orissa GRID. For this we have a 33KV/11K..

Answer / k.prakashchandra

During export, it may be possible to improve pf with
excitation.The low pf may also be attributed to erroneous
measurement by CT's at very low loads.Tr may also contribute
to low pf to some extent depending on positions of pf meter
and capacitor bank .

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is meant by CFL & PL lamps

1 Answers  


How to checked frequency drive output voltages?

0 Answers  


For a certain load i need 100kw load ,In that case what rating mccb should i use?

5 Answers  


please suggest some good universities with low cost iam in totally full confusion so please help me my profile gre 283 and ielts 5.5

0 Answers  


how to convert 1 phase power to 3phase power by using induction motor. . . .

1 Answers   BK Anand,


How can we deside Short Ckt level of electrical System,Breakers etc.please provide formula to find SC of HV side & LV side

0 Answers  


Differentiate between ideal and non ideal current sources?

0 Answers  


my field of interest is T&D. plz tell something about that.

15 Answers   TCS,


what are the advantages and disadvantages of speed control of 3 phase induction motor by varying frequency explain with drawing

0 Answers   ABB, Genpect,


what is load which is indicated in power plant generation panel? in any power plant

1 Answers  


my bachelors was done with EEE now i got admit in NU with CS as course. how to answer this qns 1) why u choose cs? 2) why u changed from eee to cs

0 Answers  


electricity bill multiplication factor 487.20xconsumption=total unit in kwh. what is 487.20 ?

1 Answers   Spec International,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)