3 ph motor connected in star delta starter. when we start
the motor it run in star but when in is going in delta it
trips the main incoming supply. why?
Answers were Sorted based on User's Feedback
Answer / deepak r thakur
simple when motor start in star three phase going to
winding correctly but when its going in delta motor two
winding connect with 440votl but 3rd winding connect same
phase so motor going in singal phasing & its get heavy
currunt it trips the main incoming supply.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / rajesh kumar sharma
Two conterctor hold on star running time after some time a conteractor whose shrt three terminals has unhold and delta conteractor is hold it change only one sccond time.
if the timer switch is not working than creat a problam.
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / anurag tiwari
Dear friend,
there are three point u have to check
1)first u check the motor winding.
2)check the timer and set the delta time.(appox 6sec).
3)If u are using mpd relay .May be your CBCT is saturated.
| Is This Answer Correct ? | 0 Yes | 0 No |
What is “pu” in electrical engineering?
What is meant by pilot exciter and its working?
How DC to AC convert
i HP = ?? 746 watts or 735.5 and how??
Dear all, Can anybody tell me that how to choose CT for a specific load? I have a 200kw induction motor, which ratio CT should be installed? Is there a formula or calculation that determines the CT ratio for a load? Regards.
what are the specifications for Dc cables of higher rating
11 kv line me tino phase takra jaye to present time me approximately voltage aur current kya hoga...
2 Answers Electrical, Electrical Tech, Videocon,
how power is generated,and transmitted to our home..pls explain briefly in simple words.
what is mean by NPS (Negative phase sequence)fault? what is the difference between EFR & OCR faults?
0 Answers TNEB Tamil Nadu Electricity Board, Vestas,
What Should I Know about Metering, Switchgear and Panels?
what is vector surge & vector shift? we have 25.3 MW(11kv) generator & 11kv/132kv transformer, connected with with 132 kv grid.vector surge relay is tripping frequentaly.what is permissible maximum limit for this.
I Have 3 Phase 10 KW AC Alternator i found one phase weak, so what will be the reason & what action shouls i take to rectify the same.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)