What is the ratio of cement ,sand, and aggregate to be used
in M20 grade of concrete when excavating 200 x 200 x 200 mm
of sand from soil
Answer Posted / sjtbehera
i do not understand your question. In is code M20=
1:1/1/2:3.
what means when excavating 200mmx200mmx200mm in sand soil.
either your question releated to bearing capcity of soil
or strength of sand or what is the minimum dstrength
recquired in sand soil. explain
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
How to calculate plastering for elevated water storage tank
calculate the quantity of water for 1:6 cement mortar
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
why we can use dust in concrete insted of fly ash
Concrete cover for slab, column, beam and footing?
Define What is a kip?
How and where are aqueducts built?
what is the criteria for the finalisation of pavement thickness in road project?
What are the different types of runners?
how to design and calculate materail quantity for concrete speedbreaker ?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
What is Time period of a building and its relation with frequency ?
Draw the cross section of a boundary wall and label its part with detailing?
what is escalation?how it is done?
How to testing voids of filled aggregate in bitumen mix design