WHAT IS MEANT BY ZERO VALUE IN QUANTITY SURVEYING
Answer / abhishek
Zero Value in Quantity Survying means
Difference Between Tender Cost (BOQ Cost) and Actual Cost
(After Execution)..
| Is This Answer Correct ? | 11 Yes | 1 No |
A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?
What is the mix proportion of m30 grade?
what is mean by bulking of sand?
11 Answers CCCL, Kanakia Group,
how many cement use for 1cum concrete for 25Grade.
What is the difference between shear and tensile strength?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
0 Answers Yirgalem Construction,
Is there a necessity for providing expansion joints in long RCC structure(say a wall of a water retaining structure)- say approximately 50 metres in length and about 4 metres high? What will be the limitations?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
which grade of cement is more suitable for construction..? and why.?? what is difference between 33, 43 and 53 grade cement..?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
what is the thickness mortar between two bricks
What is meant by autocad?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)