WHAT IS MEANT BY ZERO VALUE IN QUANTITY SURVEYING
Answer / abhishek
Zero Value in Quantity Survying means
Difference Between Tender Cost (BOQ Cost) and Actual Cost
(After Execution)..
Is This Answer Correct ? | 11 Yes | 1 No |
what is quantity of sand required to plaster wall about 1000 sq ft
how much quantity of binding wire required for tieing of 1mt of reinforcement bar?
How to find the weight of steel in feet? e.g: dia of steel is (6"') sut. We know that (1" inch 8 sut).
hi , can anybody help me about the following doubt...... what is the difference between clear cover, cover and nominal cover to reinforcement ?
How many lbs are there in a yard?
can anybody suggest me or rather send me tutorial of staad pro..iam in real need..thanks..id is:-ankit99991@gmail.com.
what will be the cement and sand needed for 1sqm plastering ? for ratio 1:6 and 10mm thick
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
0 Answers Vishal Pipeline And Engineering,
what is difference between GTS bench mark and temporary bench mark
What should be the 28 days cube strength for M-25 grade concrete?How it is connected with acceptance criteria of fck+3 as per IS 456-2000 and why?
4 Answers IVRCL, NCC, Simplex, Tata Steel Limited,
Explain what is Critical Path Method (C.P.M)?