Answer Posted / abhishek
Zero Value in Quantity Survying means
Difference Between Tender Cost (BOQ Cost) and Actual Cost
(After Execution)..
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
how many kg of 20mm, 10mm, dust available in one ton stone boulder
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
What is the difference between yeild strength and compressive strength of steel???
What is the strength of cement?
What is demising walls?
what is parametre for M25 after 7 days strength
How many litres of water used for curing of 1000sqft of slav
what are RIB slabs explain about it
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
why top layer of block work shoud be full size if any cut block adjustable than another layer?
i want texture painting pwd data
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
What are the skills required to become an architect?