what is a pretension and post tension with an example
Answer / santosh
in pretensioning the tendons(steel rod) are streched so that
stress in induced in tendons before concreting eg.railway
sleepers or beams
in post tension stresses are induced after the concreting is
done
| Is This Answer Correct ? | 9 Yes | 2 No |
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
0 Answers UPSSSC Uttar Pradesh Subordinate Services Selection Commission,
What are the different types of pile founations used?
WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?
what is the formula for calculating concrete in circular column ? pls explain with diagram add a link for diagram
how to find steel quantity
What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
21 Answers L&T, SSC,
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
Difference between Statics, Dynamics, Kinetics, Kinematics
How to calculate steel for beam slab and column
What is the standard unit of bricks???
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
What is The meaning Of Auto cad And Also Define What Is Drawing According To You
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)