how to find out the quantity of cement sand and aggregate
in slab and flooring
at first volume i.e lenght ,breadth , hieght
den for eg.
a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3 or 1.52 m3 or1.55 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
Is This Answer Correct ? | 8 Yes | 4 No |
1:6 mortar, how many self life hours ?
What is the acceptance criteria to determine the "Core density" of "DBM or BC" course,for any grade as per "MORTH" guidelines in road construction work ?
Weather we heat cement, will it changes its color? if yes why? if no why?
2. What are the advantages of your present job, things you like about it?
what is the mix design for M45 concrete
what is the construction cost for per cft of multistorryed building in kolkata?
What is the specific weight of sand?
quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above
can i place column steel lapping in floor beam? my lapping is 24 inches in floor beam and 24 inches on floor beam
Definition of plinth beam & Uses.
how the take measurement at column and beam junction
How to come 1.54 from dry to wet concrete?