how to find out the quantity of cement sand and aggregate
in slab and flooring
at first volume i.e lenght ,breadth , hieght
den for eg.
a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3 or 1.52 m3 or1.55 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
| Is This Answer Correct ? | 8 Yes | 4 No |
how the calculatio is taken for shuttering in staircase.
1 Answers JMC Projects, Tech Mahindra, TechnoArt,
how to calclate the cemment for 1 cubic metre of 1:2:4 concrete
What is the least count of Theodalite survey?
how can i determined the size of burfi ring?
1 Answers Interior Designs, Simplex,
DESIGN PROCEDURES OF R.C.C ELEMENTS
In case of columns the cover is from main steel or from stirrup & which is the IS code mentioned in it?
how material can be calculate for brick work in 1:6
what is idealized curve for concrere and steel
how to calculate the size of triangular ring in rcc column?
0 Answers Prime Perfect Buildcon,
for gravel roads in India to get 1feet height how much height we have to fill
Define What is the tensile strength of wood?
how to convert ft3 to m3?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)