at first volume i.e lenght ,breadth , hieght
den for eg.
a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3 or 1.52 m3 or1.55 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
| Is This Answer Correct ? | 8 Yes | 4 No |
State the type of roads and compare the advantages and disadvantages?
what is difference between open and well foundation ?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What are the defects in concrete?
How can i do RCC rate analysis?
residential buildings,mixing of concrete,structural,construction material,site handling.
0 Answers Saudi Aramco Shell Refinery Company SASREF,
how many shuttering material required for 1000 sq.m built up area.
what is FPS brick
How many types of stirrups are there? How to calculate their cut lengths?
from where ican get sample papers for CET-delhi 2012
how calculate the ms angle weight formula detail
9 Answers Concor, Puravankara,
What are the advantages of Prestressed Concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)