Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


explain in detail HV & LV bushing connection in power
transformer (110 / 11 kv 16 MVA)

Answers were Sorted based on User's Feedback



explain in detail HV & LV bushing connection in power transformer (110 / 11 kv 16 MVA)..

Answer / sudhirkumar singh

THE HV BUSHING i.e 110KV SHOULD HAVE THE CAPACITY TO WITH
STAND THE RATED KV i.e 110KV,AND IF IT IS HAVING THE WITH
STAND CAPACITY MORE THEN THE RATED KV THEN IT CAN BE
CONNECTED TO HV OF THE POWER T/F.IN SAME WAY THE LV BUSHING
SHOULD HAVE THE CAPACITY TO WITH STAND THE LV RATED VOLTAGE
i.e 11KV,THEN ONLY IT CAN BE CONNECTED TO THE LV OF THE
POWER T/F i.e OF 16MVA.

Is This Answer Correct ?    12 Yes 4 No

explain in detail HV & LV bushing connection in power transformer (110 / 11 kv 16 MVA)..

Answer / satish

here in 111/11 kv 16 MVA)transformer the hv side is 110kv
side i.e primary one whereas secondary side is 11kv is lv
side.

Is This Answer Correct ?    8 Yes 3 No

explain in detail HV & LV bushing connection in power transformer (110 / 11 kv 16 MVA)..

Answer / muralichppl

you question was not understand

Is This Answer Correct ?    11 Yes 8 No

explain in detail HV & LV bushing connection in power transformer (110 / 11 kv 16 MVA)..

Answer / talluri

Bushing connections at HV side is 3 and LV side is 4 with
highly insulated.Normally at substations 110/33 transformer
will be used and then same 33kv will be step down to 11kv
to avoid losses.

Is This Answer Correct ?    3 Yes 3 No

explain in detail HV & LV bushing connection in power transformer (110 / 11 kv 16 MVA)..

Answer / satheesh k

HV side bushing connection is only 3 terminals R,Y, B. In
LV side 4 terminals are there R, Y, B, N. Neutral is
grounded in station transformers. But in distribution
transformers the neutral is not grounded in secondary and
is extended to commercial use.

Is This Answer Correct ?    0 Yes 1 No

explain in detail HV & LV bushing connection in power transformer (110 / 11 kv 16 MVA)..

Answer / shyamkr

here in 111/11 kv 16 MVA)transformer the hv side is 110kv
side i.e primary one whereas secondary side is 11kv is lv side.

Is This Answer Correct ?    8 Yes 12 No

Post New Answer

More Electrical Engineering Interview Questions

how to calculate insulation level of transformer?

0 Answers  


What is the major difference between P.T. & C.V.T ? Why CVT is used in HT Transmission line in place of P.T.?

13 Answers   APGenco, OPTCL,


Why we Do not connect the windings of the motor in delta? & what would happen if we do that? I mean the winding themselves not the three lines that are coming to the motor?

1 Answers  


If breaker is undefined position, first step to do.

0 Answers   KSEB, L&T, Siemens,


what happens when we give supply to the secondary of a transformer ?? for example 415v(pri)/110v(sec)

2 Answers  


How can find thermal state value in relay for calculate thermal overload.

0 Answers  


What is the difference between a Root Locus plot and a Bode plot?

0 Answers   GE,


What is the difference between AC Drives and DC Drives?

14 Answers   College School Exams Tests, La-Gajjar Machineries, LG, Schneider, SMEL,


Dg pf .71 i am improve pf 0.80 what capacitor connected in dg how?

0 Answers   AVT Natural Products, EMC,


if receiving voltage is higher than sending ones what will be the effect of receiver

4 Answers  


How to calculate energy stored in a capacitance

0 Answers  


Do these factors (settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot)) are the part of first order, second order, higher order, linear, non-linear, open-loop, closed-loop, homogeneous & non-homogeneous systems ?

1 Answers   Limton,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)