if any chance to getting a set of solved major building
estimate with the drawing.(soft copy)
No Answer is Posted For this Question
Be the First to Post Answer
quantity of material needed for rubble stone masonry for 1:4 and 1:6
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
How to find out the quantity of steel FE415
16 Answers Bhel, L&T, TATA,
What are the types of slump?
quantity of cement required for M35 grade reinforced cement concrete
what is the types of surveying?which type of survey carrying for type of work?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
Why do we use badarpur or crusher sand with coarse aggregate in a concrete mix?
How much percentage of brick bats allowed in CD-75 bricks
Formula of mid span bar
0 Answers Modern Construction Company, PFPL,
the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this
please briefly explain calculating or estimating steel quantity for a RCC column?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)