will we have to design the UPS differently for both i.e. if
we want to connect the two batteries in parallel and/or we
want to connect the two batteries in series ?
Answers were Sorted based on User's Feedback
Answer / aamod tripathi
OBVIOUSLY THE AMPERE HOUR CAPACITY AND THE INPUT VOLTAGE TO
THE UPS WILL BE DIFFERENT IN BOTH THE CASES THUS U WILL
HAVE TO DESIGN DIFFERENTLY FOR BOTH
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / imran
In series the input voltage to ups increase and in parller
ampher hour capacity got double e.g i have two battery of
rating 12v 18ah . In parlel i get 12v 36ah and in series i
get 24v 18ah
| Is This Answer Correct ? | 2 Yes | 0 No |
which has the Ampere hour capacity greater
& which has the input voltage greater
& what would be the difference in designing the both UPS ?
thanks
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / kiran s.
You connect both battery in parallel so it will be theoretically and practically right
| Is This Answer Correct ? | 0 Yes | 0 No |
New istallation how many eathing have one transformer? Names of earthing connect places?
what is the size of ht cable of 33kv ht line and transformers ratings are 2.5mva and 5.5mva.please send formula also.
How I design capacitor bank for different load.7MW connected load.
how would you determin the horsepower of a motor without a nameplate
what is th basic difference between a d latch time line and a d flip flop time line???
wHAT IS CAPACITANCE LATCHING? hOW TO CALCULATE CAPACITANCE LATCHING? hOW TO SOLVE THE PROBLEM IF CAPACITANCE LATCHING APPLIED?
WHAT WILL HAPPEN IF WE START A MOTOR WITH STAR & IT IS RUNNING WITH STAR CONNECTION INSTEAD OF DELTA
What is K-rated transformer? What is the use of it? What can be the size(pls provide calculation if possible) of K- factor transformer for 550kW,690V motor operating with drive (VFD)?
transformer is connected with 50hz and 60hz at same rating which will give more output on same rating
How to calculate cable size for a particular load? i have 12 MW,11KV Motor 3 Phase, what should be cablesize? What are the points to remember for cable sizing calculations?
where to use CT and PT?
Hi everyone, I'm Lachuu, recently joined automation company as PLC Engineer. I have certain basic question, I request all big gurus and seniors to answer these question. Because this will be very helpful to me as well starters like me. How to design a control circuit (ex: pick & place - my current project) Yamaha robot PxYx series controller RCX222, using 6 cylinder double acting, plc keyence kv p16r 2 expansion unit for input and output each. How to select panel terminal mcb elcb powersupply. My main concern in some projects how to select dc power supply, mcb rcb(I came across dif bt b c d curves, but stil confusing, pls help me :-(. I would really appreciate all who are going respond to this question.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)