what is S04E error in jcl?
Answers were Sorted based on User's Feedback
Answer / selvam a
Solution:
So4e - Duplicate utility id has been created. A job creats a
utility id during it's execution. The utility ID will not be
terminated even if the job abends. If the same job is
submitted again without terminating the duplicate utility id
then S04E error will occur.
You can terminate this utility id in two ways
1. by writing Utility termination step in your jcl (or)
2. In Tso Db2 --> select --> BMC Administrative Products for
DB2 --> catalog manager for db2 --> db2 commands --> utility
termination option
**but only a DB2 DBA will have access for the same.
| Is This Answer Correct ? | 20 Yes | 2 No |
Answer / selvam a
S04E abend:
Explanation: When the system detects an error in internal
IBM DATABASE 2 (DB2(TM)) processing, it will abnormally end
a connected user task (TCB) or one of its own internal
tasks. For information about the reason codes associated
with this abend code, see DB2 Messages and Codes.
System Action: The system abnormally ends the connected user
task or the DB2 internal task.
Programmer Response: Check register 15 of the SDWA section
'General Purpose Registers at Time of Error', and locate the
accompanying reason code. In addition, check the information
displayed at the user's terminal,
and in the corresponding logrec data set entry.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / murali
If the job requires more space than the specified in the
Region parameter then this error will occur.
| Is This Answer Correct ? | 21 Yes | 17 No |
Answer / anita
This SO4E not SOC4, I hope people do have eye sight problem
while reading
| Is This Answer Correct ? | 9 Yes | 5 No |
Answer / jayaprabhu
this error we will get while perfroming some operations on
the Table with the WRONG lIBRARIES
| Is This Answer Correct ? | 10 Yes | 9 No |
Answer / deepak joshi
Application Programmer Response: Check register 15 of the
SDWA section 'General Purpose Registers at Time of Error',
and locate the accompanying reason code. In addition, check
the information displayed at the user's terminal, and in
the corresponding logrec data set entry.
System Programmer Response: If the error recurs and the
program is not in error, look at the messages in the job
log for more information. Search problem reporting data
bases for a fix for the problem. If no fix exists, contact
the IBM Support Center. Provide the SYSOUT output for the
job and the logrec data set error record.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / roshan.r
This abend occurs when there is lack of space (i.e) when
one of the file having FB and another file having the VB
and if it is trying to copy then this abend SOC4 would
occur.
| Is This Answer Correct ? | 2 Yes | 6 No |
Answer / mathi chelvan
As anil said ,
Mention REGION=0M in the job to avoid this error
it is working fine, thanks anil
| Is This Answer Correct ? | 1 Yes | 5 No |
why occurs clause not mentioned in 01 level
6 Answers HCL, NIIT, TCS, Tesco,
How are the next sentence and continue different from each other?
What is the utilization of copybook in cobol? Could we utilize a similar copybook?
Can a REDEFINES clause be used along with an OCCURS clause? if yes, 01 WS-TABLE. 03 WS-TABLE-EL OCCURS 5 TIMES PIC X(1) VALUE 'A'. 03 WS-EX REDEFINES WS-TABLE-EL PIC X(5). What can you expect? if no,why?
here is my requirement A1 is alphanumeric with value 'A1B2C3D4' as defined below 05 A1 PIC X(8) VALUE IS 'A1B2C3D4' but i need to have A2,A3 as ABCD & 1234 repectively...... A2 = ABCD A3 = 1234 Can you please explain me what are the different ways to do it?
hai friends ,i have HSBc exam on this sunday,my platform is Mainframe,i have 1 year exp,pls any one send me placement papers of Hsbc and technical questions on mainframe
6 Answers Citi Bank, CitiGroup, HSBC, iNautix, Wipro,
How do define Dymanic array in cobol how do u define single demensional arry and multidymensional arry in ur cobol.
Consider the following: 77 A PIC 9(10) 77 B PIC 9(10) 77 C PIC 9(19) MULTIPLY AB BY B GIVING C Which of the following is true ? (a) The execution of the above may result in size error. (b) The execution of the above will result in size error. (c) The definition of C is invalid resulting in compilation error. (d) No error will be thee and the program would proceed correctly.
) How do u handle errors in BMS macro?
which is better comp or comp-3 in terms of memory utilization?
how do u list the abended jobs?
How do you set a return code to the JCL from a COBOL program?