Follow Our FB Page << CircleMedia.in >> for Daily Laughter. We Post Funny, Viral, Comedy Videos, Memes, Vines...


if we want to increase the back up time of an UPS what
should we do ?
if we want to decrease the charging time of a
battery/batteries attached with the UPS what should we do ?

Answers were Sorted based on User's Feedback



if we want to increase the back up time of an UPS what should we do ? if we want to decrease the ..

Answer / raghunandan

To increase the back up of an UPS one needs to have higher AH
Rated battery.

Is This Answer Correct ?    14 Yes 4 No

if we want to increase the back up time of an UPS what should we do ? if we want to decrease the ..

Answer / khaleeq us salam

if we want to increase the charging of a battery first we
have to make sure that the battery have enough AH. then we
should know that there is a internal circuit in a UPS. we
can increase the charging time of a battery through that
circuit.

Is This Answer Correct ?    5 Yes 0 No

if we want to increase the back up time of an UPS what should we do ? if we want to decrease the ..

Answer / jayaraj

You have to increase the AH of the battery. Make sure that the charger of the UPS have enough capacity to charge the batteries.

Is This Answer Correct ?    5 Yes 2 No

if we want to increase the back up time of an UPS what should we do ? if we want to decrease the ..

Answer / nayan

if we attached another battery with ups then then the backup
time increased or if we attached a higher AH battery then
backup time increased. but if battery is higher AH that time
may be another charge controller assigned to reduce time of
charging and prevent the damage of UPS.

Is This Answer Correct ?    3 Yes 1 No

if we want to increase the back up time of an UPS what should we do ? if we want to decrease the ..

Answer / ram

If changing hardware is a constraint then UPS battery time
can improved by reducing the load connected to the ups !..

Is This Answer Correct ?    1 Yes 1 No

if we want to increase the back up time of an UPS what should we do ? if we want to decrease the ..

Answer / manoj

Ups- back can be increase by increasing the AH capacity of
battery or by increasing no. of battery unit.

Before doing so we need to syncronise it with Battery
charger/Rectifier.

Is This Answer Correct ?    1 Yes 2 No

Post New Answer



More Electrical Engineering Interview Questions

following are the questions asked in interviews: 1) Considering the short circuit fault, which switchgear is preferable, SFU OR MCCB? Which operates faster? whicg one is popular in Indian Market and why? 2)Define SCPD. What is type2 coodination? 3)Why the contactor rating is higher for the fuseless selection than for fuse selection? whether the ratinf of SFU or MCCB remains the same in both the cases? 4)If the HP rating is known then can you calculate the ratings of L.V Switchgear(SFU/MCCB, contactor, OLR) without using the selection chart?

0 Answers  


If we have 11 kv RYB Phase single core cable near about. Then wht effect and losses

0 Answers   Kirloskar,


can u give me a brief idea about power line carrier communication ??

0 Answers  


Upload data by LSMW via BAPI in SAP system.

1 Answers  


how to connect generators in parallel and what are the required equipment to do so?

2 Answers   MSEB,






What is Fire Panel ? How it works ?

0 Answers  


How much pf maintan in dg set in 6o% load,when Dg runnig Neutaal Earthing removed what happen.

0 Answers  


what is the use of pmg in exciter?

3 Answers  


what is the lightning arrester rating for 3.3kv system voltage

1 Answers  


How to calculate the phase to phase clearness of HT /// LT bus bar?????

0 Answers  


what is droop control?

0 Answers   BARC,


WHERE IS THE LIGHTING ARRESTER SHOULD BE PLACED IN DISTRIBUTION LINES?

26 Answers   APTransco, BARC,






Categories
  • Civil Engineering Interview Questions Civil Engineering (5076)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4445)
  • Electrical Engineering Interview Questions Electrical Engineering (16607)
  • Electronics Communications Interview Questions Electronics Communications (3915)
  • Chemical Engineering Interview Questions Chemical Engineering (1092)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (214)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (258)
  • Instrumentation Interview Questions Instrumentation (2992)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (123)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (0)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1378)