if we want to increase the back up time of an UPS what
should we do ?
if we want to decrease the charging time of a
battery/batteries attached with the UPS what should we do ?
Answers were Sorted based on User's Feedback
To increase the back up of an UPS one needs to have higher AH
Rated battery.
| Is This Answer Correct ? | 14 Yes | 4 No |
Answer / khaleeq us salam
if we want to increase the charging of a battery first we
have to make sure that the battery have enough AH. then we
should know that there is a internal circuit in a UPS. we
can increase the charging time of a battery through that
circuit.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / jayaraj
You have to increase the AH of the battery. Make sure that the charger of the UPS have enough capacity to charge the batteries.
| Is This Answer Correct ? | 5 Yes | 2 No |
Answer / nayan
if we attached another battery with ups then then the backup
time increased or if we attached a higher AH battery then
backup time increased. but if battery is higher AH that time
may be another charge controller assigned to reduce time of
charging and prevent the damage of UPS.
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / ram
If changing hardware is a constraint then UPS battery time
can improved by reducing the load connected to the ups !..
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / manoj
Ups- back can be increase by increasing the AH capacity of
battery or by increasing no. of battery unit.
Before doing so we need to syncronise it with Battery
charger/Rectifier.
| Is This Answer Correct ? | 1 Yes | 2 No |
hello!my name is sheikh iam preparing for indian engineering servieces,please send me the old question papers..to sheikhshaazforjobs@gmail.com
What is tan delta & PPM in transformer? and whats its IS value?
what is Bucholtz Relay test???? Explain??
What is the effect on power factor, shown by a trivector meter; incase of reverse phase sequence. If the power factor of a system is lag what meter will show in case of reverse phase sequence connected to the meter. and What in case of lead.
Why Parallel operation of two Transformer are Required?
how dc load convert to ac load
How many types of DC current
Why we get neutral from EB department, if not what will happen if we use earth instead of neutral? what is the result at the time of monsoon or rain with thunder and lighting ?
What is bode plot?
Is there any difference of regulation of transformer, alternator , transmission line, if yes, what is it?
what is the operation of UPS ? can any one answer me?
why ht cable end termination don't have a gland?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)