1. what type of winding of slip ring ac induction motor rotor and why. 2. how the heating element use in two phase (415 volt)and what rating of element, you prefered.
1 4873MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)
2391Post New Simbhaoli Sugars Interview Questions
What are the three parts of a lambda expression? What is the type of lambda expression?
What are the main elements of windows desktop?
How do you escape in java?
What does async mean in c#?
What is structure pointer in c?
Explain the difference between c++ and java.
Can I send output of job to my remote device careerride123?
What is the difference between delegates and notifications in iOS operating system?
explain what is a newline escape sequence?
What are the causes of emergency stop in a steam engine?
What type of database is postgresql?
You are ready to perform the Activity Sequencing process for your project. To make your job easier, you're going to use a software tool to help you draw a PDM network diagram. Most software programs use this technique. You know all of the following are true regarding the PDM except: A. It shows the activities on arrows and connects them to dependencies usually depicted as circles. B. It’s also called AON. C. It shows the activities in boxes with arrows connecting the dependent activities. D. It uses four types of dependency relationships of which finish to start is one.
What is mockmvc in spring?
What is the protected method modifier?
what is the diffrence betwen primary pumps and secondary pumps in aircoditioning field