if we want to increase the back up time of an UPS what
should we do ?
if we want to decrease the charging time of a
battery/batteries attached with the UPS what should we do ?
Answer Posted / jayaraj
You have to increase the AH of the battery. Make sure that the charger of the UPS have enough capacity to charge the batteries.
Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
I need model question papers for RRB section engineer Chennai... Please send to my E-mail Id:- maitheerainbow@gmail.com
what is acceptable leakage current for 33kv cable while doing high voltage test for cable? how to calaulate the leakage current for 33kv or any rated cable?
what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)
why the difference arise between HT reading & LT reading (submeters fixed in complexes, apartments etc)if the power factos exceed from 0.9 to 1 can the ht meter reads fast?
Can RCD's used to protect the VVVF drive if not why.
Instrument connected to a single phase supply
what work will do diffrential realay DG set
Is it required to use Automatic transfer Switch in L&T panel board if we use AMF panel with DG set? How the single line diagram will be? Please forward the material to sreenu_207@yahoo.co.in
How to select a cable size for particular load?
can we use CBCT in neutral of solidly grounded transformer? in place of three phases we can pass only one phase which decreases the size of CBCT?
What is meant by vector group
If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables
Hi Everyone ! My Name is Hakim ullah khan please i need formula of Cable Rating because i want to calculate by self without check any Table Chart... Thank you.....
XYZ
Whether 3 phase induction motorwith 100 hp capacity , Amp 160 for which sensitive earth fault relay , type CTUM 15 can be used?