Answer / v.sivakumar
Scheduling can be done in two areas
1. Infoview (which is explained in the before answer)
2. Through CMC (Central management console)
steps followed
1. Create a calendar according to your requirement.
2.Select the schedule tab in the object which you want to
schedule.
Note: In CMC object referes to report.
3.specify the destination
4.specify the format
5.select the calendar in the scheduling option and lookup
the calendar what you created for this requirements
6.schedule it
for more clarification mail me
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / abhishek
HI all
For sheduling any report open info view as admin
privilage ,then each and every reprot having a sheduling
option which is like a tab in bottom of each report click
on it then there is new window apper fill its all filed
like its sheduling time,its destination folder etc
| Is This Answer Correct ? | 13 Yes | 4 No |
Answer / neetu
Scheduling in BO XI R2 cab be done using infoview.Below
mentioned are the steps to follow
1.Open the appropriate folder of the report.
2.Towards the right side of the panel you can see the
reports available.
3.Below the report name "Schedule " option is available
along with History,properties.modify.
4.click on Schedule
5.A new window will pop up
6.Enter the details i.e When,Destination,Format etc.
7.Finally click on Schedule button.
The report will be scheduled
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / arabandisowmya
To Schedule a Web I document:
1. Locate the report you want to schedule.
2. Click schedule under the report link.
3. Select options
1. When
2. Destination
3. Format
4. Caching options(you can export the document as excel,
standard HTML, or PDF)
4. Click Schedule
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / guest
XIR2 scheduling the report using scheduler in
administrator(Supervisor module).
| Is This Answer Correct ? | 4 Yes | 9 No |
What is recurring sheduling and batch scheduling?
What is the difference between the public object&schema object?
Table A, Table B is there, that colums are different like tabl A contian (A varchar(9), B varchar(2), date), table B contian(D varchar(10), E varchar(2), F date) , i want 2 compare mismath datatype length in both table, how? do you know any in built function?
how many reports have u created ? explain a few.
1 Answers InfoStep, Ness Technologies, TCS,
use scheduler to refresh report.....explain please.....
Explain about a task that really tested your analytical abilities?
There is one report running and a user wants to know whether data is from detail table or summary table. what is your approach?
How will you know the version of Bo using designer?
4 Answers Tavant Technologies,
How many tables can an universe contain is their any limit to insert tables in the universe?
What is Array bind size in universe? Plz
in sap bi we have wad, then why we go for sap bo
How can we use multiple data providers in a single report in business objects?