How do scheduling the report in BO XIR2? can you say what
are they steps?
Answer Posted / guest
XIR2 scheduling the report using scheduler in
administrator(Supervisor module).
Is This Answer Correct ? | 4 Yes | 9 No |
Post New Answer View All Answers
Explain the difference between union and group?
Explain difference between zabo and webi?
Are data mart and dwh normalized or denormalized? Do both of them exist in the same tier?
What task is 98% of the required work of a business analyst?
Explain is it the job of a business analyst or systems analyst to draw the class diagram?
what is document design in boxi,have u participate in that
Difference between b.o 5.1 and 6.1b?
I have set of reports in BO4.0 and need to use "Hyperlink" functionality. I had to use native hyperlink functionality provided in BO4.0 but looks like it's available only in Rich Client.Currently,we have only Infoview B04.0 Launch Pad.Is OpenDoc the only hyperlink option on BO4.0 Launch Pad? Thank you.
How to create a new calendar in CMC? Can u please tell me the process to create the required calendar. Ex:- Year of that calendar to start with Jan-15 and ends with Jan -30 and the Next month to start with Feb-31 and ends with Feb-14.
webI report not showing Barcode in PDF format, i have used BC39 font,but barcode is shown in HTML but not in PDF, please any solutions??
How to Explain about BO projects in interviews?(in Banking,insurance,Manufacturing domains)
what are the tables used in health care domain project and columns used in report?
What is thumbnail?
Explain what if a cartesian product pop up block appears when running a report. Does it give wrong values? How to solve this issue?
How to open a universe with out using the Designer ??