How do scheduling the report in BO XIR2? can you say what
are they steps?

Answer Posted / guest

XIR2 scheduling the report using scheduler in
administrator(Supervisor module).

Is This Answer Correct ?    4 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the difference between union and group?

635


Explain difference between zabo and webi?

656


Are data mart and dwh normalized or denormalized? Do both of them exist in the same tier?

592


What task is 98% of the required work of a business analyst?

581


Explain is it the job of a business analyst or systems analyst to draw the class diagram?

594






what is document design in boxi,have u participate in that

1663


Difference between b.o 5.1 and 6.1b?

653


I have set of reports in BO4.0 and need to use "Hyperlink" functionality. I had to use native hyperlink functionality provided in BO4.0 but looks like it's available only in Rich Client.Currently,we have only Infoview B04.0 Launch Pad.Is OpenDoc the only hyperlink option on BO4.0 Launch Pad? Thank you.

3000


How to create a new calendar in CMC? Can u please tell me the process to create the required calendar. Ex:- Year of that calendar to start with Jan-15 and ends with Jan -30 and the Next month to start with Feb-31 and ends with Feb-14.

1894


webI report not showing Barcode in PDF format, i have used BC39 font,but barcode is shown in HTML but not in PDF, please any solutions??

3928


How to Explain about BO projects in interviews?(in Banking,insurance,Manufacturing domains)

4326


what are the tables used in health care domain project and columns used in report?

4039


What is thumbnail?

582


Explain what if a cartesian product pop up block appears when running a report. Does it give wrong values? How to solve this issue?

636


How to open a universe with out using the Designer ??

6622