How do scheduling the report in BO XIR2? can you say what
are they steps?
Answer Posted / neetu
Scheduling in BO XI R2 cab be done using infoview.Below
mentioned are the steps to follow
1.Open the appropriate folder of the report.
2.Towards the right side of the panel you can see the
reports available.
3.Below the report name "Schedule " option is available
along with History,properties.modify.
4.click on Schedule
5.A new window will pop up
6.Enter the details i.e When,Destination,Format etc.
7.Finally click on Schedule button.
The report will be scheduled
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Explain is there any default username & pwd for bo designer & supervisor?
Is there any other repository domains rather than universe, security, document?
Explain what task is 98% of the required work of a business analyst?
what is universe null
Tell me a business scenario where I can achieve the data through MINUS only not through subquery.
What is package in BO
how get the grand total in master-detail report?
How to schedule the report in b.o?
can some body explain how migrate the BoXI r2 to BO 3.x and crystal reports XI r1 to Crystal report 2008 ?
Explain what sort of existing documents should business analysts refer to when starting on a new project?
Explain in detail about type 2(scd),
What is a fantrap in business objects?
How we drill up week to month?
Its regarding Javascript coding for customization in BI4 reports. We need to have all the options disabled in the report except the option to Export(save the report in computer in Excel/pdf formats). I am able to hide TopBar,TabBar,Left Navigation etc but I need "Export" option to be displayed to the users in Read mode. Can this selective "hiding" be achieved?
What three things do you consider to be the most important factors for a manager?