Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


. The string effcy in AC sys is 80% Then for same power, the
string effcy in dc sys is
a) less than 80% b) 80% c) more than 80% d) zero



. The string effcy in AC sys is 80% Then for same power, the string effcy in dc sys is a) less tha..

Answer / akula satya verrendra

More than 80% ie of course for unidirectional is 100%

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is the minimum value of hfe for the oscillations in transistorized rc phase shift oscillator?

0 Answers  


use of PIR in ehv breaker

0 Answers  


what factor is necessary during design of HT & LT MOTORS.

2 Answers   ABB, L&T,


how to compare with Relay settings for HT&LT panels, RMU panel, and PSS CSS transformer?? 1) Load amps, 2)Tripping time, 3) CT ratio, 4)Cable size 5) Transformer KVA rating 6) transformer full load amps

0 Answers  


I want to apply for ONGC recruitment 2012 .I am BE Electrical but it is mentioned that to apply for this post you have to have Electrical supervisor certificate .so please tell me from where can i get such certificate ???

1 Answers  


how could we calculate the no of outgoings from a 800 watt distribution board

0 Answers   United Engineering,


what is the resistance value of our human body?

9 Answers  


c++ write a program to use a fuction call "max"which accepts an intger arrey of size5.as an arrument and return the larger and smallest of the arrey to main without changing. the original changing of the original position of the element of the arrey.

0 Answers  


what is the procedure for three phase motor differential relay testing can it do with single phase test kit?

1 Answers   ABB,


WHAT IS THE MEANING OG (li = 7 In)

0 Answers  


what are check points to be checked while charging switchyard?(CT,PT,BREAKER,POWER TRANSFORMER)

1 Answers  


why Lightening Arrester Probe sharp at Top of telecom tower.

0 Answers   Reliance Jio,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)